Refurbishment of
Vampire by Vekoma, providing new floorless trains and ride system. Photos taken in Jan / Feb 2002.
Hold your mouse over
a picture for a description.
|
January 2002 |
|
10th |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
Scaffolding
has been placed on both Vampire's lifts to refurbish the
chain lift mechanisms. Trenches have been dug around the rides
course to increase the space between the track and the
ground to accommodate the new trains. The previous Arrow
trains are now stored on the rig site, along with old wheels
and other various parts. |
|
|
February 2002 |
|
27th |
|
 |
 |
 |
 |
 |
|
Not much noticeable change
apart from the scaffolding towers around the course, for
welding and train clearance. |
|
|