March 2005 |
|
22nd |
|
 |
 |
 |
 |
 |
|
Welcome to
the Stealth construction gallery - it's nice to be creating
one of these again! I doubt the updates will be as frequent
as the last two coasters, but I will update each time
anything major happens. Due to popular demand I have
included the Stealth concept drawing provided to SP from
Cerberus. Construction at the moment just consists of
initial land clearing, with the removal of Model world and
Flying Fish - RIP. |
|
|
May 2005 |
|
18th |
|
 |
 |
 |
 |
 |
|
The Stealth
site has been cleared, flattened and prepared with gravel.
We now await ride foundations and footers. |
|
|
July 2005 |
|
6th |
|
 |
 |
 |
 |
 |
|
Since the
last update the majority of the rides foundations have been
set in place. Work continues on the footers and the large
hydraulic building which is based at the end of the launch
track. |
|
|
27th |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
Pace has
picked up with the erection of the station. It has an
identical setup to Rita at Alton Towers - including the same
control booth and framework for the countdown launch lights.
Last three photos were taken from Tidal Wave on 26/07/04 -
note that most of the concrete footers are now complete. |
|
|
August 2005 |
|
17th |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
Work continues on ride
foundations and the hydraulic building. This building is
around twice the size of Xcelerator's equivalent (similar
ride). Last photo shows the Time Lapse camera Thorpe
have installed for marketing purposes. |
|
|
September 2005 |
|
7th |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
First two
pics were taken on 05/09/05 and show a view of the station
and maintenance building from Tidal Wave. Remaining photos
show the first piece of track to be placed, and by the end
of the day, the entire launch section was in. Looks like the
ride will be constructed very quickly. |
|
|