Hold your mouse over
a picture for a description.
|
October 2001 |
|
28th - Last day of season |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
The photos above show some familiar and
alternative angles of the ride. Little visible construction has taken
place since the last update, but that doesn't mean work has not continued.
Lights have been placed all the way up the lift. Almost all supports have
been securely bolted down, and station track is in place. |
|
|
November 2001 |
|
18th |
|
 |
 |
|
The circuit is now complete, with the recent
installation of the transfer and maintenance track. |
|
|
December 2001 |
|
29th |
|
 |
 |
 |
 |
|
The station walls are going up, with the
rides computer system now in place. The long process of connecting
everything together and cabling has begun. The chain has been added to the
lift, it is viewable in photo 4. |
|
|
January 2002 |
|
3rd |
|
 |
 |
 |
 |
 |
|
The first stages of testing
has begun, by means of a track pull through. The transfer
and shop building framework are up. Theming has started on
the outside of the station. |
|
|
19th |
|
 |
 |
 |
|
The station exterior is almost finished,
work continues on the other two buildings. The maintenance shed is
complete, but unfortunately does not match the nice style of the other two
buildings. |
|
|