|
Hold your mouse over
a picture for a description.
|
September 2002 |
|
5th |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
Since the last update the transfer track,
safety and service brakes, start of lift and storage track have been
erected. Framework for the volcano theming has gone up and large amounts
of steel continue to arrive. |
|
|
12th |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
The lift has been topped off and work continues on
the walkway beneath it. |
|
|
26th |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
The curving drop, vertical
loop and zero-g roll have been erected since my last visit.
The station has also been covered, and the rockwork theming
started. |
|
|