Project Calypso Construction

 

Oldest >> Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 << Latest

 

Hold your mouse over a picture for a description.

 

June 2002

23rd

A view from Detonator

Scaffolding has been taken down in the tunnel

The two supports are now visible in position

The majority of footers now hold plates

Anchor footer for drop now ready for steel

Work continues on the many footers and foundations all over the site.

 

July 2002

11th

A view from Detonator

A close up of the station area

Station area - note the new steel on top right of tunnel

A view from the train

Work being carried out on the remaining few footers

Foundation work is coming to an end, should be mostly structural work from here on. The floor base has been laid in the station. You will climb and enter the volcano from the front, above the tunnel.

 

28th

Station area

The huge maintenance building has been erected

The station will be this size, if not taller!

Another view

A closer view

Tarmac has been laid around the site

The trench for the water feature under the loop

More tarmac laid

The train store / maintenance building framework has been erected. Tarmac has been poured on the future paths around the site as a temporary surface for access.

 

August 2002

3rd

Station area

Close up of the station lowering floor

Side view of the lowering station floor

Another view

Early landscaping

The lowering station floor has arrived and has been placed on top of the tunnel roof with other steel beams.

 

24th

A view of the station area

Another view from Detonator

Station and drop in to tunnel

A rapid change of direction through the tunnel

Station drop

The tunnel has been made water tight with tar

A view of the maintenance building and station from behind

Track is complete up to the base of the lift

Service brake (left) and safety brake (right)

Supports for the main drop

Another View

Transfer track support

Large deliveries of steel started to arrive on the 4th August. Much has been erected since then; complete up to the base of the lift. The lowering floor has been installed, along with the upper station structure. A second trench has been dug for the water feature under the entrance to the second corkscrew.

 