This page follows the various phases of the mythical Lost City area at Thorpe Park, from 2001 - 2005.

Phase 2 (Colossus) is covered in greater detail in the relevant section.

Hold your mouse over a picture for a description.

 

Phase 1 - Vortex and Zodiac - January 2001
7th

The whole construction area

A closer view - The four tall statues of DDD's still remain

All that is left of the Enterprise is the console (right)

Another view

Work started with the removal of the Enterprise for refurbishment and demolition of Dare Devil Drivers.

 

25th

Construction area

Vortex's future home

The new walkway

Zodiac (Enterprise) without pods

Lost City plaza area

Construction continues in the new Lost City with Vortex foundations complete, Zodiac installed and the creation and theming of a new walkway down in to the area which will provide good views of Zodiac when in operation.

 

March / April 2001
18/03/01 06/04/01 (Opening Day) 21/04/01

The whole construction area

The Vortex queue has been erected

Only the ride structure remains to be installed

Final Vortex construction after a late delivery

Theming to be added to the ride structure

First two pics show the area a few weeks before opening. Vortex failed to open with the park, despite being advertised which caused a fair bit of controversy with some parties, especially Watchdog! :)

 

Phase 3 - Quantum and Eclipse - February 2003

12th 25th

Preparing the foundation for Quantum

Preperation for Eclipse, behind

Completed foundation for Quantum

Another view

Preparing the foundation for Eclipse

Early construction of the Fabbri duo. Was great how they kept the majority of vegetation to create two wonderful 'jungle' type queue lines. They did the same for Rush too.

 

March / April 2003
30/03/03 06/04/03

Quantum construction nearing completion

Another view

A look at the centre piece

The double support for Eclipse

A view from Octopus' Garden

Continued construction of Quantum and Eclipse. Little did we know that 'the big wheel' would only last two seasons!

 

Phase 4 - Samurai - March 2004
19/10/03 12/03/04

Deconstruction of Calgary Stampede

Deconstruction of Calgary Stampede

Deconstruction of Calgary Stampede

Samurai in testing

The transfers make it look a lot better than shown here

October 2003 meant the deconstruction of the classic Calgary Stampede to make way for the mighty warrior from Chessington; Samurai. Above are two pics taken just before park opening.

 

Phase 5 - Rush - March 2005
22nd

Banner advertising Rush

One of two huge footers

From the other side

Looks like Eclipse's signage will be used again

Rush was the first S&S Screamin' Swing outside America, and we got a larger version for higher throughputs.

 

April 2005
12th

View from Detonator

The two huge supports

The queue line will be paved with bricks

Looking in to the ride area with the console now in position

A chunky addition to the Lost City

Thorpe Park really does have the finest collection of flat rides in the UK, possibly Europe?

 

-